We have created this for all our family and friends so you can easily follow our Australian house building adventure

Wednesday, October 13, 2010

The exciting part has begun!

Had an email today to say that siteworks had commenced so thought I would run up to Ellenbrook to have a quick look and was amazed to see that we have a pad down already!  Photos speak louder than words so here they are :)

Pad from the front, the sandy section to the right will be the garage and the raised section at the front is the hallway


Sunken Home Theatre


The light grey area is the Bathroom, Toilet and Laundry


Looks a bit messy at the minute but LWP have cut back the red retaining wall as we requested to allow adequate access between the wall and the portico pillar which will be placed on the small concrete pad just visible behind the red brick on the floor


The pad from the front corner of the garden, the light grey section is the En Suite bathroom, Shower and Toilet


Another one a bit closer up


The alfresco area with small concrete pads for the pillars


Pad from behind the Alfresco


Really chuffed to see it all happening finally they have thrown this down really quickly so hopefully a good sign for the rest of the build, the pad looks really well laid as well so hopefully it'll still look as good once its dried out.

Drains are being dug next apparently but not sure when thats going to happen will probably run up at the weekend to see how its looking then.
share on: facebook

No comments:

Post a Comment