Mum and Dad are here and got the shock of our lives today when we took them up to show them the slab, we have bricks and some walls !!!
share on: facebook
Sunday, October 31, 2010
Friday, October 22, 2010
We have drains connected and windows & soakwells on site
As the title says really they have done what they said they were going to do this week. The soakwells are huge going to have to check with the builder exactly where these are going to be located just incase they sink them where we might later want to dig...
share on: facebook
Here's a view of the road so you can see how its coming on, quite a few houses shooting up now
share on: facebook
Wednesday, October 13, 2010
The exciting part has begun!
Had an email today to say that siteworks had commenced so thought I would run up to Ellenbrook to have a quick look and was amazed to see that we have a pad down already! Photos speak louder than words so here they are :)
Pad from the front, the sandy section to the right will be the garage and the raised section at the front is the hallway
Sunken Home Theatre
The light grey area is the Bathroom, Toilet and Laundry
Looks a bit messy at the minute but LWP have cut back the red retaining wall as we requested to allow adequate access between the wall and the portico pillar which will be placed on the small concrete pad just visible behind the red brick on the floor
The pad from the front corner of the garden, the light grey section is the En Suite bathroom, Shower and Toilet
Another one a bit closer up
The alfresco area with small concrete pads for the pillars
Pad from behind the Alfresco
Really chuffed to see it all happening finally they have thrown this down really quickly so hopefully a good sign for the rest of the build, the pad looks really well laid as well so hopefully it'll still look as good once its dried out.
Drains are being dug next apparently but not sure when thats going to happen will probably run up at the weekend to see how its looking then.
share on: facebook
Pad from the front, the sandy section to the right will be the garage and the raised section at the front is the hallway
Sunken Home Theatre
The light grey area is the Bathroom, Toilet and Laundry
Looks a bit messy at the minute but LWP have cut back the red retaining wall as we requested to allow adequate access between the wall and the portico pillar which will be placed on the small concrete pad just visible behind the red brick on the floor
The pad from the front corner of the garden, the light grey section is the En Suite bathroom, Shower and Toilet
Another one a bit closer up
The alfresco area with small concrete pads for the pillars
Pad from behind the Alfresco
Really chuffed to see it all happening finally they have thrown this down really quickly so hopefully a good sign for the rest of the build, the pad looks really well laid as well so hopefully it'll still look as good once its dried out.
Drains are being dug next apparently but not sure when thats going to happen will probably run up at the weekend to see how its looking then.
share on: facebook
Thursday, October 7, 2010
Siteworks start next week
After what feels like an eternity of waiting i've just had a call from Ultimate Homes to say our siteworks start next week, finally we can get something interesting on the blog as things start to happen :)
share on: facebook
share on: facebook